Dashboard Overview

3

The 1 Sep 14:15

Electricity

412,746 MWh

2.2% from yesterday

Utility / Facility : 65%
Lighting : 25%
Emergency : 12.5%

Electricity Usage

Name Status Area Total (MWh)
Motor A Normal Building A Fl.1 2,558
Motor B Normal Building A Fl.2 2,159.6
Motor C2 Normal Building B Fl.2 1,798.2
Conveyor A1 Normal Factory 1 513.38
Conveyor A2 Normal Factory 1 517.42
Shuttle Cart 1 Warning Warehouse A1 1,800.6
Shuttle Cart 2 Normal Warehouse A1 1,798.2
Lifting Elevator A Normal Warehouse A1 1,564.3
Lifting Elevator B Critical Warehouse A1 1,862.2
Motor A1 Normal Building C Fl.1 1,321
Conveyor
Lifting Elevator

Conveyor A1

Status

Normal

Area

Factory 1

Total

513.38 MWh

Operations time

45 minutes 30 seconds

Working 2,345 from 5,000
Planned finish time 2 hours
Vibration 0.38 m/s³
Speed 1.8 m/s
Temperature 70°C
46.9% done 53.1% left

Conveyor A2

Status

Normal

Area

Factory 1

Total

513.38 MWh

Lifting Elevator Information

No data available at the moment.

Motor A

Vibration 5.2 mm/s
Temperature 68°C
Current 15.2 A
Location Building A F11

No more alerts

All systems are operating normally

Maintenance Log

  • Mr. A fixed Conveyor A

    in Building B

    15/04/2025

  • Conveyor A is broken

    in Building B

    15/04/2025

  • Mr. A fixed Conveyor A

    in Building B

    15/04/2025

  • Mr. A fixed Conveyor A

    in Building B

    15/04/2025

  • Mr. A fixed Conveyor A

    in Building B

    15/04/2025

Maintenance Calendar

April 2025
Sun Mon Tue Wed Thu Fri Sat
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Conveyor A Maintenance
16
17
18
Motor B Inspection
19
20
21
22
23
Emergency Repair
24
25
26
27
28
29
30
1
2
3